To build up this final year project, there are 3 main stages need to be done.
STAGE 1: Brainstorming, Research & Feasibility Study
STAGE 2: Documentation Preparation & Presentation (Proposal , Progress Report & Demo)
STAGE 3: Project Implementation, Mechanical Construction, Software Development, Instrument Wiring, Troubleshooting
The
period allocated for this research study is around 6 months. It is started in
Jan 2012 and completed in June 2012. Practically, the
performance of a desired devices is often difficult and it will take a long
period or the large number of troubleshooting required in order to make the
devices functioning. Hence, the time allocated to make the prototype and final
report is from June 2012 until October 2012. In this chapter, I include the
Gantt chart for time estimation to complete the project from FYP Degree
Semester 1 until FYP Degree Semester 2.